Scheduled Maintenance

The data center will be performing scheduled network
maintenance this Friday night to replace the core2 router. Although
the time frame for the maintenance is 2AM-8AM (Saturday, February
13), they do not anticipate any lengthy downtime as a result.
 

What did you think of this article?




Trackbacks
  • No trackbacks exist for this post.
Comments
  • No comments exist for this post.
Leave a comment

Submitted comments are subject to moderation before being displayed.

 Enter the above security code (required)

 Name (required)

 Email (will not be published) (required)

Your comment is 0 characters limited to 3000 characters.